
Installation:
① It is installed at the plane node formed by supports and hangers.
② Place the spring nut according to the size of the connector.
③ Fix it with hexagon bolt and screw it to the specified value.
| Product number | Surface treatment | W/100 | Packing | ||||
| EG | HG | SS | |||||
| F1026 | ? | ? | ? | 17 | 25 | ||
Design load data for standard U-groove connections

The calculation is based on the bolt and nut of M12, and the torque is equal to 65 nm.
Installation:
① It is installed at the plane node formed by supports and hangers.
② Place the spring nut according to the size of the connector.
③ Fix it with hexagon bolt and screw it to the specified value.
Copyright ? 2020 U?Channel??Advanced?Materials?Technology?(Shanghai)?Co.,?Ltd